top of page
Search

Sports block door strip

  • drichardsonbch
  • Aug 12, 2021
  • 1 min read

All the door sets have been removed from the sports block and the classrooms. New fire door sets will be installed as part of the refurbishment along with electrics, ceilings, flooring and re decoration. Next week the stair case is removed in this block as well to be replace.

 
 
 

Commentaires


bottom of page