drichardsonbchFeb 21, 20221 min readNew service runsThe new water and other services have been laid in a new trench between the old building on the right and the new one on the left. The drains have also been installed as well to serve this new building.
The new water and other services have been laid in a new trench between the old building on the right and the new one on the left. The drains have also been installed as well to serve this new building.
Комментарии