top of page
Search

Creative Arts block latest

  • drichardsonbch
  • Feb 9, 2022
  • 1 min read

Both staircases are now in. The drainage has been run to the locations inside the building. All the concrete floor sections have been lifted in. next week the roof has a concrete screed added.

 
 
 

Comentarios


bottom of page