Creative Arts block latestdrichardsonbchFeb 9, 20221 min readBoth staircases are now in. The drainage has been run to the locations inside the building. All the concrete floor sections have been lifted in. next week the roof has a concrete screed added.
Both staircases are now in. The drainage has been run to the locations inside the building. All the concrete floor sections have been lifted in. next week the roof has a concrete screed added.
Comments