top of page
drichardsonbch

Corridor change


The end of the corridor outside room 111 will be a new tank room once all the works are complete. To prepare for the works a new wall has been built to block the end of the corridor and a new door has been knocked through the side of the building. The door in the photo is a temporary door until the new one arrives. The new tank room will house new water tanks as well as a series of pumps to support a new attenuation tank outside for the drainage.

101 views

Recent Posts

See All

Comments


bottom of page